Risk Assessment Studies
List of Projects:
- GEOROCK Construction Corporation
Oil Spill Risk AssessmentManiguin Island, Antique (November 1994)
- Shell Philippines Exploration B.V. (SPEX)/Occidental, Philippines (OXY)
Oil Spill Risk Assessment Study, Offshore Exploratory Drilling Project, Northwest Palawan, Philippines (August 1997)
- Shell Philippines Exploration B.V. (SPEX)
Oil Spill Risk Assessment Study Cliffhead “A” Offshore Oil Exploratory Drilling Project, Northwest,Palawan, Philippines (December 1997)
- East Asia Utilities Corporation
Oil Spill Risk Assessment Study, 75 MW Bunker C-Fired Diesel Engine Power Plant, Cebu City (June 1997)
<back to top>
Oil Spill Risk Assessment Study Offshore Exploratory Drilling Project, Central West Palawan. (Febraury 1998)
- OGDEN Energy Philippine Holdings, Inc.
Oil Spill Risk Assessment Study, 45 MW Diesel Power Plant ProjectCEPZA, Rosario, Cavite (March 2000)
- Magellan Cogeneration Inc.
Site Assessment Study of Oil Spill Contamination, 45 MW Bunker C-Fired Diesel Engine Power Plant Project, CEPZA, Rosario, Cavite (May 2001)
<back to top>
Environmental Risk Assessment, 1200 MW LNG-Fired Power Plant Project, Mariveles, Bataan (July 2001)
Environmental Risk Assessment, Nickel Mining & Refinery Project, Nonoc Island, Surigao City (April 1999)
- Asian Alcohol Corporation
Preparation of a Detailed Risk Management Plan WTP (Methane Reactor) Project Pulupandan, Negros Occidental (May 1998)
- Asian Alcohol Corporation
Mathematical Modelling on Dispersion of Effluent Discharges from Alcohol Distillery Plant Along Guimaras Strait, Pulupandan, Negros Occidental (June 1998)
<back to top>
|
| |
| |
| |
| |
| |
|
|
|